Starting without a clear plan
Before demolition, the plan should already cover layout, where the plumbing and outlets go, storage, lighting, ventilation, fixture measurements, finishes and the total budget. Measure more than once, and check door swings, drawer clearance, walking space and shower access. A vanity that looks right online is often too large once it is in the room.
Setting a poor budget
Budget for labor, materials, permits, delivery and waste removal, then hold something back for what demolition uncovers. Damaged subfloor, old plumbing and weak walls are common finds. Spend where replacement is hard, on waterproofing, plumbing, cabinets, flooring and skilled installation. Decorative pieces can be swapped later; bad work behind the wall cannot.
Poor ventilation
Size the exhaust fan to the room, vent it outside rather than into the attic, and place it where it can actually clear steam. A window on its own is often not enough in Florida.
Choosing style over daily function
Open shelving gives less storage than it promises, a large tub eats the walking space, and a deep sink shrinks what fits under it. Ask who uses the room, whether mornings are busy, whether you want a tub or a shower or both, whether two sinks would help, and whether accessibility might matter later.
Ordering before final measurements
Vanities block doorways, faucets do not always fit the sink, and shower doors need clearance nobody allowed for. Confirm sizes, finishes, installation requirements and delivery dates, and buy extra tile for cuts and future repairs.
Ignoring lighting and electrical
One ceiling fixture is not enough. Layer general, vanity, shower and accent lighting, and place outlets and switches before the walls close.
Rushing
Waterproofing needs care, products need cure time, and custom cabinets, glass and countertops have lead times. Delaying the start is far better than stalling halfway through.